Acer AB460 F1 Manuale Utente Pagina 162

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 161
3 Server Blades: Setup and Installation
142
Figure 3-98. Power Control
Click Server Power Control in the left Options Window (2) to display
the Power Control submenu as shown above.
(3): Power Control and Status: This submenu indicates the status and
the current power control settings of the host server (the remote
console). The status of the remote server are displayed as below:
Reset Server: Click on this radio button to reset the power control
settings for the remote server.
Power Off Server - Immediately: Click on this radio button to
immediately power off the remote server.
Power Off Server - Orderly Shutdown: Click on this radio button to
power off and shut down the remote server in an orderly manner.
Power On Server: Click on this radio button to power on the
remote server.
Power Cycle Server: Click on this radio button to power cycle the
remote server.
(4): Perform Action: After selecting a power setting from the list above,
click on this item to execute the command and perform the action.
1
2
3
4
Vedere la pagina 161
1 2 ... 157 158 159 160 161 162 163 164 165 166 167 ... 617 618

Commenti su questo manuale

Nessun commento